|

Aqua Panama Towers
PANAMA CITY BEACH
W.G. Yates Construction
-
Completed 12/06 | 233 Units ____________________________________________________

Bella Riva
OKALOOSA ISLAND
W.G. Yates & Sons Construction -
Completed 10/06 | 45 units ____________________________________________________

ABACOS
Santa Rosa Beach, FL
Crane Lord & Sons -
Completed 10/06 | 13 Units
____________________________________________________

Turquoise Place
Orange Beach, AL
W.G. Yates & Sons Construction -
Construction ongoing | 400 units
A new milestone for height of any property along the
Alabama Gulf Coast, Turquoise Place will rise to an imposing 370 feet
tall, with 400 units housed within two towers: each encased in
shimmering "turquoise" glass.
Past local restriction for height of a condominium development was
set at 14-stories, but Turquoise Place broke through restrictions
and will tower from 24 to 32-stories in height.
____________________________________________________

AZURE
Okaloosa Island
W.G. Yates & Sons Construction | 126 Units
The AZURE complex
on Okaloosa Island was completed in December 2005 with an unobstructed view of
the Gulf.
____________________________________________________

Harbour Village
PANAMA CITY
Landmark / Brice Construction -
Completed 2006 | 88 units ____________________________________________________

SURFSIDE
Mexico Beach
Brice Const -
Completed 2007 | 18 units
____________________________________________________

VILLAGE OF S. WALTON
Seagrove Beach
Maxus Construction - Completed 6/06 | Units 54
____________________________________________________

SAVANNAH
Brasfield & Gorrie - Completed 2006 | 10 Units
____________________________________________________

PALMETTO HOTEL
Panama City Beach
Landmark Const. -
Completed Late 06 | 52 units
____________________________________________________

PORTOFINO I, II, III, IV, V
Pensacola Beach
W.G. Yates & Sons Construction -
Completed mid 2007 | 800 units ____________________________________________________
Brasfield & Gorrie Construction
Completion: ONGOING | Units 339
____________________________________________________

Escapes
Orange Beach, AL
Hoar Construction -
Completion: ONGOING | Units 88
Scheduled
for a Spring 2008 opening, Escapes! to the Shores will be Escapes!’
second beach resort located on the sugar white sands of Orange Beach,
Alabama. The resort will be a mixed use development, with the top two
floors reserved for luxurious, two-story penthouses.
____________________________________________________

CARIBE I, II, III
Orange Beach, Al
W.G. Yates Construction | 590 Units
Caribe's
contemporary architectural design, 14-story towers with dramatic
14-story skylit atriums, include lush natural landscaping and water
features. The 23 acre Resort borders more than 1-1/2 miles of
unspoiled shoreline, pristine beaches, protected natural habitat,
and experiences breathtaking sunsets. ____________________________________________________

Harbor Walk
Destin, FL
Moss Anderson Construction - Completion: ONGOING | Units 269
The centerpiece of the Harbor Walk Village lifestyle, Emerald Grande
will be one of the most sought-after real estate developments on the
entire Gulf Coast. 281 luxury vacation condominiums will be available
in two-, three- and four-bedroom models.
____________________________________________________

Marina Landing
Panama City Beach
Edgewater General Contractors -
Competed Mid 2007 | Units 87
Situated on the shore of St. Andrews Bay in Panama City Beach ___________________________________________________

HARBOR LANDING
Destin
Roy Anderson Const. -
Completed Early 2007 | Units 82
Two luxury 12-story low-density buildings (82 units total) offer 2-4 bedroom units ranging from 1,531 to 3,136 square feet ____________________________________________________

Harbor Lights
Destin
Crane Lord & Son -
Completed mid 2007 | Units 39
Harbor
Lights combines the imagination that fueled the creation of what
promises to be Holiday Isle's most sought after residential address
____________________________________________________

EMERALD BEACH I, III
Panama City Beach
Dooley Mack / Royal Construction -
Completed 2006 | Units 530
Emerald Beach Condominiums are located within the beautiful Emerald Beach Resort and Spa ____________________________________________________

REFLECTIONS
Panama City Beach
W.G. Yates Construction -
Completed early 2007 | Units 86 ____________________________________________________

Seawinds
Gulf Shores, AL
McCrory Building Company -
Completed mid 2006 | Unit 155 ____________________________________________________
Snug Harbor
Pensacola Beach
CTC Development Corp. -
Completed late 2006 | Units 86 ____________________________________________________
Beach Club
Pensacola Beach
W.G. Yates & Sons, -Compelted Mid 2006 | Units 114
____________________________________________________
Navarre Landings
Navarre
Russell Construction -
Completed early 2007 | Units 23
____________________________________________________
Beach Colony
Navarre Beach, FL
ARD Contracting Inc. -
Completed: January 2008 | Units 113
|